Collection and test of ore smelting test samples

Collection and test of ore smelting test samples Before sampling, the sample design should be prepared in consultation with the test unit and the design and production department according to the test purpose and requirements. The collection of test samples at all stages of the laboratory i

Successful development of thin film evaporator technology for coatings

The thin film evaporator technology for coatings jointly developed by Shanghai Huasheng Chemical Co., Ltd. and Beijing Xinte Technology Co., Ltd. has passed the appraisal of the expert group. Experts agree that this technology has filled the domestic gap.

In 2002, Chi

Dispatching work on the construction site of mining engineering

I. Status and content of construction site dispatching work (I) The role of construction site dispatching work Site dispatching work is a powerful measure to implement the construction operation plan. It can solve various problems occurring during construction and prevent possible occurrences t

LED lighting fixtures efficiency dimmable driver


Governments are increasingly demanding energy-saving requirements to motivate dimmable light-emitting diode (LED) lighting requirements. To achieve high-performance dimming and solve flicker problems, Texas Instruments has released two highly integrated phase-adjustable phases. The AC-DC L